|
[an error occurred while processing this directive]
|
Schematic diagram of the GSR calibration and scanner system. The GSR
scanhead periodically moves out of the framework for zenith viewing on
a trolley system, and shares time observing the atmosphere and the two
temperature-controlled blackbody reference targets.
GSR in process of assembly on March 7, 2004 in Barrow, AK. This photo
shows the GSR framework with the external calibration targets and the
scanhead with the radiometers installed are shown.
GSR radiometers mounted on the scanning drum scanhead.
GSR operating in Barrow, AK, during the WVIOP04, on March-April 2004.

Calibration, dwell, and continuous scanning sequence of the GSR.
GSR in motion samples (mpg) from Barrow, Alaska, on March 10 2004

Time series of Tb between 50 and 60 GHz.

Time Series of Tb for channels around the 183.31 GHz water vapor line.

Time series of Tb near the 380.2 GHz water vapor line.
|
|